Accomplishments for 10/14-10/15
Tyler and I made some more headway this weekend. We finished the following:
- Replaced the floor joists under the old red bathroom.
- Sealed up the attic doorway with new joists.
- Removed the last wall for the stairway to the attic.
- Laid down the new subfloor over the new floor joists.
- Pulled down the remaining nails from the joists above the opening for the spiral staircase.
- Swept down the cellulose insulation from 50% of the second floor in prep for electrical work.
- Removed debris from the master bedroom, master bathroom, master closet and shared bathroom area.
- Finalized the floor plan for the second floor master bathroom, master closet, laundry room and shared bathroom.