Progress Update

I thought it was about time that I update everyone on the current state of renovations. Currently, all renovations have been limited to the second floor. These renovations include:

  • All demolition work has been completed.
  • Rough framing of walls between rooms has been completed.
  • All electrical runs have been made to the basement.
  • Master Bathroom electrical rough-ins have been completed.
  • Shared Bathroom electrical rough-ins have been completed.
  • Master Closet/Laundry electrical rough-ins have been completed
  • Foyer electrical rough-ins have been completed.
  • New roof installed.
  • New vent stack run.

The following renovations still need to be completed before inspections:

  • Electrical rough-ins need to be completed.
    • SE Bedroom
    • SW Bedroom
  • HVAC layout and installation
  • Plumbing
  • Install ladder to attic.
  • Install windows.

Once that work is completed and the inspections are over, Tyler and I can have the insulation installed. Then, it's time for drywall!

 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name (required)

 Email (will not be published) (required)

 Website

Your comment is 0 characters limited to 3000 characters.